Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Topic: HS2 Footpath Closures
    Posted: 21 February 2018 at 10:02am
Hi, does anyone know when and which footpaths are being closed when HS2 starts? I'm guessing at most of the ones round the NSE but wish to know for sure.  Also be interested to know whether the main one from St Giles to Amersham is affected.  If anyone has a link to a map maybe?

Newland Park development looks like it is going ahead from September (where is the school going - the new building in Maple Cross?) so hopefully still be able to use those footpaths too.

Back to Top
Sponsored Links


Back to Top
cspfan View Drop Down
Newcomer
Newcomer


Joined: 30 July 2009
Status: Offline
Points: 35
Post Options Post Options   Thanks (0) Thanks(0)   Quote cspfan Quote  Post ReplyReply Direct Link To This Post Posted: 21 February 2018 at 7:12pm
The new school in Maple Cross is a free school that has been operating in Watford area for the past 3(?) years. The school at Newland Park, despite being on a 7 year lease, was given notice to quit by September just before half term. Could move to Crown House in Wuycombe but "several irons are in the fire" for something more local
Back to Top
watsy View Drop Down
Chalfont Admin
Chalfont Admin
Avatar

Joined: 11 January 2005
Status: Offline
Points: 1426
Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Posted: 15 April 2018 at 9:51pm
If anyone is interested, I received this letter about the Chesham Lane HS2 site just after they started.



Edited by watsy - 16 April 2018 at 9:13am
Back to Top
hissing sid View Drop Down
Chalfont Oldie
Chalfont Oldie
Avatar

Joined: 12 January 2005
Status: Offline
Points: 10566
Post Options Post Options   Thanks (0) Thanks(0)   Quote hissing sid Quote  Post ReplyReply Direct Link To This Post Posted: 15 April 2018 at 11:28pm
Originally posted by watsy watsy wrote:

If anyone is interested, I received this letter about the Chesham Lane HS2 site just after they started.


Directory not found. 


Edited by watsy - 16 April 2018 at 9:14am
Back to Top
watsy View Drop Down
Chalfont Admin
Chalfont Admin
Avatar

Joined: 11 January 2005
Status: Offline
Points: 1426
Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Posted: 16 April 2018 at 9:14am
Sorry should now work, it had added some space at the end.
Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 16 April 2018 at 3:21pm
meeting at the parish council offices ( i think tonight ) about hs2 and the works in the locality
need a stella and i need one now !
Back to Top
watsy View Drop Down
Chalfont Admin
Chalfont Admin
Avatar

Joined: 11 January 2005
Status: Offline
Points: 1426
Post Options Post Options   Thanks (0) Thanks(0)   Quote watsy Quote  Post ReplyReply Direct Link To This Post Posted: 17 April 2018 at 8:25am
Couldn't make it last night unfortunately, anyone have any info or links.
Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 17 April 2018 at 3:46pm
me neither, was away from csp last night....
need a stella and i need one now !
Back to Top
Paul_G View Drop Down
Chalfontonian
Chalfontonian


Joined: 11 January 2005
Location: Vanuatu
Status: Offline
Points: 621
Post Options Post Options   Thanks (0) Thanks(0)   Quote Paul_G Quote  Post ReplyReply Direct Link To This Post Posted: 25 April 2018 at 12:35pm
Doesn't the ecology and habitat pdf rather miss the point?  A few HGV movements, some mud on road that will be cleaned up, work to finish by end of May 2018. All very sweet and good for nature blah blah. Who would get very upset about that?

But isn't this where the intervention shaft is going? HS Poo is 60m underground here so they'll have to excavate to 70m minimum. And a 15m x 15m minimum cross-section? (just guessing). That's getting on for 16,000 cubic metres of soil and rock to get rid of. Plus all the construction equipment and materials going to site.  Rather more than 'a few HGV movements' I think.  And completion by end of May 2018? I think not.
Back to Top
big baggles View Drop Down
Chalfont Snapper
Chalfont Snapper
Avatar

Joined: 11 January 2005
Status: Offline
Points: 7320
Post Options Post Options   Thanks (0) Thanks(0)   Quote big baggles Quote  Post ReplyReply Direct Link To This Post Posted: 27 April 2018 at 4:44pm
sad to say i have to agree, the numbers, sums and statistics for Hs2 just seem to be numbers plucked out of thin air, - i remember being in a presentation about the soil and spoil from excavations in the chilterns going london bound by rail to be  deposited in and around the brakespear road area of harefield/ ickenham, raising ground level by meters....

is this still happening ?
need a stella and i need one now !
Back to Top
 Post Reply Post Reply Page  12>

Forum Jump Forum Permissions View Drop Down

Forum Software by Web Wiz Forums® version 12.06
Copyright ©2001-2023 Web Wiz Ltd.