Points: 1517
Post Options Post Options   Thanks (0) Thanks(0)   Quote Henry Quote  Post ReplyReply Direct Link To This Post Topic: GX road changes
    Posted: 11 September 2017 at 10:28pm
We have waited for years for Packhorse Road to be sorted out. Over the last few weeks the kerb works have been carried out, with the new tarmac laid over the junction over a couple of nights. I drove through GX tonight to see a team of men doing a very nice job of paint the road markings.
 
Does this mean they have finished the road surface?
 
When driving along the new raised surface past Station Road you drop down a large ramp outside Jack and Alice onto the failed road surface.
 
Why did they not surface the section of road with all the holes in it?
 
This sort of waste of money is unforgivable.
Keep the green belt green
Back to Top
Sponsored Links


Back to Top
lesleyr View Drop Down
Villager
Villager
Avatar

Joined: 14 September 2009
Location: United Kingdom
Status: Offline
Points: 235
Post Options Post Options   Thanks (0) Thanks(0)   Quote lesleyr Quote  Post ReplyReply Direct Link To This Post Posted: 11 September 2017 at 11:23pm
Hi Henry I understand that the rest of the roadworks are to be finished by bucks highways. The work that has been carried out has been done and paid for by Tesco with the approval of the town council.
Back to Top
allotmentman View Drop Down
Newcomer
Newcomer
Avatar

Joined: 22 February 2017
Location: CSP
Status: Offline
Points: 12
Post Options Post Options   Thanks (0) Thanks(0)   Quote allotmentman Quote  Post ReplyReply Direct Link To This Post Posted: 13 September 2017 at 4:26pm
I take your point, 

but whilst all the equipment was on site, it would have been easier and cheaper to do all the repairs.

I consider it very bad planning and a waste to money too.
Back to Top
lesleyr View Drop Down
Villager
Villager
Avatar

Joined: 14 September 2009
Location: United Kingdom
Status: Offline
Points: 235
Post Options Post Options   Thanks (0) Thanks(0)   Quote lesleyr Quote  Post ReplyReply Direct Link To This Post Posted: 13 September 2017 at 9:15pm
I too agree with you. But the mismanagement of this is down to bucks highways. It has been postponed countless times to allow bucks highways to scheduled the work. Some penpushers up there somewhere still cannot get there act together. We should all remember this when we vote next time.
Back to Top
ian View Drop Down
Villager
Villager


Joined: 16 May 2016
Status: Offline
Points: 100
Post Options Post Options   Thanks (0) Thanks(0)   Quote ian Quote  Post ReplyReply Direct Link To This Post Posted: 15 September 2017 at 11:37am
I agree. Why could they not have coordinated the works better. It's our money they fritter away by their inefficiencies